Run Above Maximum Analysis Report


Concept

In this topic you will go through the steps for running the above maximum analysis report.


Steps:

  1. Click in the User ID field.

    Step 1
  2. a valid value
     e.g.
    Enter
     "rebecca.west"
     into the User ID field.

    Step 2
  3. Click in the Password field.

    Step 3
  4. a valid value
     e.g.
    Enter
     "welcome1"
     into the Password field.

    Step 4
  5. Click the Sign In button.

    Step 5
  6. Click the Main Menu button.

    Step 6
  7. Click the Compensation menu.

    Step 7
  8. Click the Base Compensation menu.

    Step 8
  9. Click the Salary Plan Reports menu.

    Step 9
  10. Click the Above Maximum Analysis menu.

    Step 10
  11. Click the Add a New Value tab.

    Step 11
  12. a valid value
     e.g.
    Enter
     "MAXAN"
     into the Run Control ID field.

    Step 12
  13. Click the Add button.

    Step 13
  14. Click in the As Of Date field.

    Step 14
  15. a valid value
     e.g.
    Enter
     "08/01/2015"
     into the As Of Date field.

    Step 15
  16. Click the Run button.

    Step 16
  17. Click the Server Name drop-down list.

    Step 17
  18. Click the PSUNX list item.

    Step 18
  19. Click the OK button.

    Step 19
  20. Click the Report Manager link.

    Step 20
  21. Click the Refresh button.

    Step 21
  22. Click the CMP005 link.

    Step 22
  23. Click the cmp005_30971.PDF link.

    Step 23
  24. Step 24
  25. Click the Close Tab button.

    Step 25
  26. Click the Home link.

    Step 26
  27. Click the Sign out link.

    Step 27

You have completed the steps for the Run Above Maximum Analysis Report topic.

Table of Contents  Start Topic